Check My Lot
// Grand Junction & Mesa County
Instant ADU Lot Check
Enter your address to see your lot lines and which of our ADU plans fit, drawn to scale. In Grand Junction and unincorporated Mesa County you’ll also see the ADU rules for your zone. In Fruita and Palisade you’ll see your lot and Colorado’s ADU law, and we confirm the town’s own rules by hand. It’s free and takes a couple of minutes.
Planner not loading? Refresh the page, or book a free consultation or call (970) 753-6006 and we’ll run the check with you.
// What You’ll See
Your Lot, Your Rules, Our Plans
01
Your Lot Lines
Parcel boundaries and the buildable area from Mesa County maps, with the setbacks we can verify taken out.
02
Your Zone’s Rules
The ADU rules for your zone in plain English, with links to the city or county code they come from.
03
Our Plans to Scale
Place our ADU plans on your lot. Drag and turn them to see which ones fit and where.
04
A Starting Price
Turnkey starting prices with site work and utility allowances, plus a 3D view of the ADU on your lot.
// ADU Rules
Grand Junction or Mesa County?
Inside Grand Junction City Limits
The city’s ADU program allows one detached accessory dwelling unit on a lot with a single-family home. Habitable floor area is capped at 900 square feet, the ADU doesn’t need its own parking space, and you’ll need a Planning Clearance before the building permit. Placement and setbacks depend on your zone district, which the lot check sorts out for you.
Unincorporated Mesa County
A Grand Junction mailing address doesn’t always mean city rules. Homes in places like Clifton, Whitewater and parts of the Redlands and Orchard Mesa fall under Mesa County’s own ADU guide, which requires planning approval before the building permit, and septic properties need that system checked. The lot check tells you which jurisdiction your parcel is in.
Why check before you pick a floor plan? Two backyards with the same ADU can cost very different amounts. Access, slope, sewer and water runs and where the house sits all move the number. Construction typically takes about 3–5 months (roughly 90–115 working days) once permits are issued, and getting the layout right up front is the fastest way there.
// Town Rules
Fruita and Palisade
Inside Fruita City Limits
Fruita has its own zoning code, so Grand Junction’s 900 square foot cap and the county’s lot-size tiers don’t apply. Fruita is on Colorado’s list of cities that must allow one ADU wherever a single-family home is allowed, with staff-level approval and no owner-occupancy requirement. Fruita’s code allows one ADU per lot of up to 1,000 square feet of heated space, or 50 percent of the house if that’s greater, with no parking requirement. The lot check shows your parcel and places our plans to scale. It doesn’t apply Fruita’s setbacks yet, so we confirm them with the city before you choose a plan. Fruita’s ADU fee-waiver program was still listed as “coming soon” when we checked on November 3, 2026. Read more in our Fruita ADU guide.
Sources: Fruita Land Use Code §17.05.100.D · City of Fruita ADU Program · Colorado DOLA: Accessory Dwelling Units · checked Nov 4, 2026
Inside Palisade Town Limits
Palisade writes its own land development code, and Colorado’s ADU law also applies there: the state lists Palisade as a town that must allow one ADU per single-family lot, without an owner-occupancy requirement and generally without new parking. Parts of Palisade’s 2023 code predate that law, so we confirm the current size, placement and parking rules with the town before we quote a layout. The lot check shows your parcel and our plans to scale. Send it to us and we’ll follow up with what the town allows on your lot.
Sources: Town of Palisade Land Development Code (rev. July 25, 2023) · Colorado DOLA: Accessory Dwelling Units · checked Nov 3, 2026
// FAQs
Questions We Hear a Lot
Is the lot check really free?
Yes. Checking your lot, placing plans and seeing starting prices costs nothing, and you don’t have to talk to anyone to use it.
Is this an official zoning answer?
No. It’s a planning tool built from public parcel maps and the published code. Lot lines on county maps can be off by a few feet, and the City of Grand Junction or Mesa County makes the final call. A survey and a planning review confirm everything before you build.
What happens after I send it to you?
It comes straight to our team. We’ll look at your lot, your plan and your goals, then reach out to set up a free consultation and a site visit.
Does the lot check work in Fruita and Palisade?
Yes for your lot lines and our plans to scale. Each town’s own ADU rules aren’t loaded into the tool yet, so it shows Colorado’s ADU law and we confirm the town rules by hand after you send us your layout.
// Next Step
Rather Talk It Through?
Book a free consultation and we’ll walk your property with you, or browse our plans first. Thinking about the money side? Read how to finance an ADU and how our build process works. You can also see what an ADU costs in Grand Junction, how Mesa County ADU permits work, and our Fruita ADU guide.
Lot data and planner by ADU Insights. Reviewed November 2026 by Caleb Blair, founder of God’s Country Development and ICC-licensed general contractor.