Build Your Dream ADU in Fruita
ADUs only. Fixed price. Built on your lot.
A second home on the property you already own. Most of the ones we build now keep a family together — aging parents, adult children, two generations on one lot. Others are built for rental income, or as a home base while you travel. We design it around your lot, quote a fixed price, and carry it through permitting, site work and construction right here in Fruita.
// What We Do
What you can
build here
10
Plans to build from
Ten ways to build, 580 to 900 square feet
Six floor plans, four of them also offered above a garage. Every one of them fits what Fruita allows. Three to start with:
$175,000*
Echo
580 SF · 1 Bed · 1 Bath
Guest suite, home office, single-occupant rental
$204,000*
Charlie
900 SF · 2 Bed · 2 Bath
Rental income, multigen, premium long-term rental
$248,000*
Charlie Rise
900 SF · 2 Bed · 2 Bath
The same plan above a two-car garage
Building Exceptional Accessory Dwelling Units in Fruita and Beyond
God’s Country Development builds ADUs only, detached and attached, and Fruita is one of the markets we work in every year. The first thing to get straight is whose rules apply: a lot inside Fruita city limits follows Fruita’s own Land Use Code, not Grand Junction’s and not Mesa County’s. From Fruita’s Land Use Code section 17.05.100.D, current as of November 2026. Two things the code leaves to staff, which setbacks a detached ADU uses and exactly how heated floor area is measured, we confirm with Fruita planning for your lot before anything is drawn. All ten of our configurations sit under Fruita’s 1,000 square foot cap. Smaller in-town lots usually suit the compact plans, Echo at 580 square feet and Foxtrot at 600, while the larger Rural Estate and South Fruita Residential lots take the 900 square foot plans comfortably. Four plans are also offered above a garage if parking and storage matter more than yard. See all ten plans and prices. Our stock-plan ADUs run $161,000 to $206,000 turnkey without a garage (580 to 900 square feet) and $215,000 to $255,000 with a garage below, including typical utility-connection work and site work. Utility tap fees and planning clearance fees are not included. Fruita has been standing up a grant-funded program to reduce some ADU fees; what is open at any given moment is the city’s to decide, and we walk you through the current options during onboarding. Once permits are issued, construction typically takes about 3 to 5 months, roughly 90 to 115 working days. Use our free Check My Lot tool to see your lot lines and which plans fit, then we will come out for a free site visit. It is a preliminary look, not a survey or a zoning decision.Building an ADU in Fruita
Fruita’s ADU rules today
The full guide to Fruita ADU rules, costs and fee waiversWhich plans fit a Fruita lot
Cost and timeline
Start with your lot
See what fits your lot
Draw your parcel and place our floor plans on it to scale. It is free, it takes a couple of minutes, and it is a starting point rather than a survey or a zoning decision — we confirm the details with Fruita before anything is drawn.
Come walk one with us.
Before you sign anything, stand in one. We will show you a finished ADU, walk you through one under construction so you can see the framing and the insulation, and put you in touch with a past or current owner privately — no one from us in the room. Building a home is a big decision and you should be able to see our work and hear what working with us is like before you make it.
// Accessory Dwelling Unit Development
Why Choose Us for Your ADU Build in Fruita
Expertise You Can Trust
We build ADUs and nothing else. The plans, the crews and the process are tuned to one thing, which is why we can quote a fixed price and hold it.
End-to-End Service
From initial design to final walk-through, our team ensures every aspect of your ADU project is handled with care. You’ll never feel lost in the process – we’ll guide you every step of the way.
Local Fruita Knowledge
As experts in the Fruita area, we understand local building codes, zoning laws, and the unique needs of homeowners in this community. Your project will comply with all regulations while reflecting the beauty and character of Fruita.
Superior Craftsmanship
Quartz counters, birch cabinetry, LVP floors, craftsman trim, solid-core doors and tile showers — in every plan, at every price. The finish package decides how it looks; that list is what it is made of.
Your Vision Realized in Fruita
Your Fruita Accessory Dwelling Unit should feel like home. That’s why we take the time to understand your needs and goals, turning them into a functional, beautiful, and uniquely your space.
// Working Process
Effortless Path to Success Discover Our Workflow
STEP 01
Consultation
Let’s talk. We start by understanding your goals and how an ADU can accomplish them. From there, we provide a proposal for that scope of work. Schedule your free consultation.
STEP 02
Planning
Where the details get narrowed down. Use one of our models or design something custom. We furnish construction documents, handle permitting, fix problems early, and end with a signed build packet agreement.
STEP 03
Construction
After all planning and clearances are received. We begin building your project. Construction typically takes about 3–5 months (roughly 90–115 working days) once permits are issued.
STEP 04
Warranty
At the completion of your project, we walk with you to remedy any items you want repaired or missed to ensure your satisfaction. After handoff, if anything comes up, we want to be the first to look at it.
About ADUs
// FAQs
Frequently Asked Questions
What is an ADU?
ADUs are Accessory Dwelling Units, mother-in-law suites, or granny flats that are built onto the land of an existing house. They can be attached or detached. Most commonly, they are built onto the back of underutilized land in downtown lots, where alley access and density allow for a smooth interface between the two. They make great rental units to generate extra income off the property. ADUs also work great for multigenerational living arrangements, bringing family closer to you while still providing privacy for everyone.
Where can I build an ADU?
ADUs are generally allowed on single-family lots across Mesa County, including Grand Junction, Fruita and Palisade, with some exceptions based on the type of home, lot size and HOA rules. You can check your property for free with Check My Lot, or give us a call for a stress free consultation, and we will answer all questions you may have. The state of Colorado and municipalities across the state are passing laws to ease regulation on ADUs, encouraging construction, and reducing costs.
Are these modulars?
Why Wait? Let’s Get Started!
Your dream ADU is just a conversation away. Let’s work together to create a space that enhances your property and fits your life. Contact God’s Country Development today to schedule your consultation and take the first step toward your perfect ADU.
Your ADU vision deserves the meticulous attention of God’s Country Development in Fruita. Let’s make it a reality!
Call us today at (970) 753-6006
— or —